Saturday, 4 January 2020

Environmental Review Panel Go/No-Go Checklist

When I retired I was able to concentrate on Policy Dynamics Inc.  My first project was for the Serpent River First Nation.  They had established an Environmental Review Panel (ERP) to evaluate economic development proposals to ensure that environmental considerations were given a high priority.

The Serpent River First Nation’s ERP had developed a detailed questionnaire to be completed by managers of economic development proposals.  The onus is on the proposal manager to explain the goals and impact of their projects by fully completing the questionnaire.  The role of the ERP is to evaluate the proposals to ensure the First Nation receives economic and social benefits without sacrificing the environment.  To conduct this evaluation, the ERP needs to be satisfied with the data provided by the proposal manager in their completed questionnaires.

Go/No-Go Checklists have been used for many years in the aviation industry when pilots need to conduct a complex pre-flight inspection of their aircraft.  Go/No-Go Checklists have been successfully adapted for hospital use to ensure that medical procedures are conducted correctly by doctors and nurses prior to operations.  As the title suggests, if the checklist is completed satisfactorily, then the operation is a Go.  If the checklist is not completed to the operator’s satisfaction, it is No-Go.

I had worked with checklists in the Department of National Defence and although this wasn't a simulation problem, I thought a Go/No-Go Checklist implemented in Microsoft Excel macros might support the ERP’s evaluation of the questionnaires. The Go/No-Go Checklist I developed has nine satisfaction levels of increasing importance.  Each of the nine satisfaction levels in the evaluation has been assigned multiple questions from the questionnaire.  In the checklist, the questions in each satisfaction level have been cross-referenced with sections in the written questionnaire. 

There are cells to identify the proposal by name along with the proposal manager.  There is also a cell to identify when the Checklist was last updated.  The Checklist spreadsheet file would be saved individually with a proposal specific name.

Each satisfaction level is colour coded as Red (unsatisfactory), Yellow (partially satisfied) and Green (satisfactory).  The calculation of the colour code is done automatically by the macro software as the ERP conducts its evaluation of the questionnaire.  The colour codes are sequential.  That is, satisfaction level 2 cannot be reached (Green) until satisfaction level 1 is obtained (Green).  All nine satisfaction levels must be Green for the ERP to recommend the proposal be a Go.  Until that time, the proposal is a No-Go. 

Figure 1 shows an example of a Satisfaction Level Summary in which satisfaction level 1 is achieved (Green) and satisfaction level 2 is partially achieved (Yellow).  Some questions in satisfaction level 3 have been answered but the satisfaction level is still Red.  No questions in satisfaction levels 4 through 9 have been answered yet.
Satisfaction Level
Satisfaction Level Achieved
1
2
3
4
5
6
7
8
9










Figure 1: Satisfaction Level Summary


There is a cell in the checklist labelled “Green set point is:” (see Figure 2).  The value in this cell should be between 0 and 100.  This value is used by the macro software to compute the colour code for each satisfaction level based on the percent of the questions in each level that have been satisfactorily answered.

Green set point is:
75%

Figure 2: If 75% of the Questions are Answered Satisfactorily the SL is Coded Green

It is recommended that the Green set point be 100% because the goal of the Go/No-Go checklist is to ensure that all of the questions in the questionnaire have been answered satisfactorily before the project is approved as a Go.

However if the user wants, the value of the Green set point could be set to, for example, 75%.  The user would type the value 75 into the appropriate cell and press Enter.  Then if there are 8 questions in satisfaction level 1, once 6 of the questions in that section have been completed satisfactorily, the cell under satisfaction level 1 in the summary turns Green (see Figure 1).

Entering a value in the cell labelled Yellow set point (see Figure 3) is similar to the result when entering a value in the Green set point cell.  Assume the value in the Yellow set point cell is, for example, 50% and the value in the Green set point cell is 75%.  If there are 14 questions in satisfaction level 2 and 7 questions are completed to the satisfaction of the ERP, the cell under the satisfaction level 2 in the summary turns Yellow (see Figure 1).


Yellow set point is:
50%

Figure 3: If 50% of the Questions are Answered Satisfactorily the SL is Coded Yellow

If there are 4 questions in satisfaction level 3 and only 1 question is satisfactorily answered, the cell under the satisfaction level in the summary turns Red (see Figure 1).

There is a cell entitled “% Complete is now set at:” (see Figure 4).  The value in this cell should be between 0 and 100.  It is used by the software to compute when each question has been satisfactorily completed.  That is, an individual question can be partially completed and the software will consider the question to be satisfactorily answered.

% Complete is
now set at:
75

Figure 4: A Question Needs to be 75% Complete to be Considered Satisfactory

It is recommended that the value of % Complete be set to 100.  However, if the user would like to set the % Complete to, for example, 75%, then the user would type 75 in the cell and press Enter. 

One reason this approach might be useful is if, for example, three out of four members of the ERP thought the question was satisfactorily answered, the user might move the slider beside that question to 75% complete.  At that point, the cell beside the question would turn green suggesting the ERP is sufficiently satisfied with the answer given by the proposal manager.

There are comments cells provided in the project identification section and for each of the satisfaction levels.  These comment cells are for the user to make notes and are not used by the software.

Each of the nine satisfaction levels in the evaluation has been assigned multiple questions from the questionnaires.  The satisfaction level description table attempts to explain how the questions have been organized (see Figure 5).  




SATISFACTION LEVEL (SL 1-9) DESCRIPTIONS
1
Project Identification is Satisfactory
2
Project Activities and Preliminaries are Satisfactory
3
Benefits to First Nations are Satisfactory
4
Consultation with First Nation Communities is Satisfactory
5
Turtle Island Issue Identification is Satisfactory
6
Turtle Island Issue Considerations are Satisfactory
7
Problem Avoidance is Satisfactory
8
Risk Mitigation is Satisfactory
9
Reclamation Issues are Satisfactory

Figure 5: Summary Description of the Satisfaction Levels

Each of the questions assigned to a satisfaction level is numbered and cross-referenced with the written questionnaire. 

For each of the questions in the checklist, there are three ways for the ERP to express their impression of the quality of the proposal manager’s answer. 

One way is to use a slider or the arrow keys to increase or decrease their impression of the quality of the answer.  For example if the slider was used to move the cell beside the question to the 65 point, the cell would turn yellow meaning the ERP is not sufficiently impressed with the answer that was given by the proposal manager. This is because the % Complete set point was 75.  If the slider in was used to specify the cell to be 75, the question is considered by the ERP to be sufficiently complete and the colour of the cell would turn green and the box beside the question would become checked.

The second way for the ERP to show their impression of the quality of the answers in the checklist is to simply enter a number into the cell beside the question.  In this case, if the value entered is less than 75, the cell would be coloured yellow and if the value entered is equal or greater than 75, the cell would be coloured green. 

The third way to record the ERP’s impression of the quality of the proposal manager’s answer is to click the checkbox beside the question.  By clicking the checkbox, the ERP indicates that the question is completely answered (100% and therefore green).

One of the benefits of the Go/No-Go Checklist is that it can be used to identify areas where the proposal manager’s answers to the questions are not complete or not acceptable to the ERP.  Then the ERP can go back to the proposal managers and get them to complete that question in more detail, or change their proposal to assure the ERP that the environmental factors are being sufficiently addressed.

Although this work didn't involve simulation, it was well-received by the Serpent River First Nation Environmental Review Panel.